Well, we had to call an electrician to get the kitchen ready for our new cabinets and appliances. No one would call us back until yesterday. He wanted to tear out walls to fix it and he was going to charge us $1,300. And then we'd still have to fix the freakin' walls! Rudy, our tech here at work, offered to do it for $500 and not tear out all of the walls. So, he came over last night to do it. We were there until 1:30 AM. He's still not finished because part of it has to wait until the cabinets are in. So, we'll be finishing that up on Thursday night. It's such a pain in the rear.

The drywall is about finished. Larry said that he was finished, but Sammy is making him come back to redo one corner of the half bath. It wasn’t as smooth as it should have been. Joe and I were just going to let it go, but Sammy didn’t want us to feel shafted. It’s the corner next to the door where there are just a few inches of wall. The floors upstairs still aren’t done. He went back and sanded them another time and he sanded the stairs. Then he had to pull staples out of the living room floor because Joe never finished his job. He’s going to be doing the staining today. And sanding the downstairs. He said that the staining upstairs shouldn’t take long.

Buddy didn’t show up yesterday. He didn’t answer any of Joe’s phone calls. He did tell us that he’d be working on another job yesterday, but it wouldn’t take all day. I’m ready to kill him. When he put in the tile in the half bathroom, it looked funny to me. I thought it was because it was dirty (there was dust from the drywall all over it). Well, last night I went in and swept it up so that I could get a real look at it. It’s 2 different tiles in there. There are 5 tiles of what we actually picked out (that dark brown tile), and then the rest of the bathroom is in a dark tile with lots of reddish colors in it. And then, I was sweeping up the kitchen last night (because there was sawdust from where Rudy had to cut some of the walls for the new sockets) and stuff kept getting trapped between the tiles. He did a shitty job of grouting the tile. There are deep holes in it so stuff falls into it. So, Joe is going to make him fix the grout in the kitchen. We have to talk to him about the half bathroom.

Joe spoke to Buddy just a little while ago. He argued with Joe about the tile in the half bathroom. He thinks it's the same throughout. It's obviously not. Even Rudy just glanced at it last night and said that it was different. You don't have to look closely to see that it's 2 different tiles!

Before, Buddy told Joe that he could finish everything by Friday. Joe spoke with him the night before last. The problem was that the floor guy (refinishing the hardwoods) would be in the way of Buddy. Joe told Buddy that he worked it out with the floor guy so that he will not do the foyer until Thursday. That meant that Buddy could continue working on the other bathrooms until Thursday or possibly Friday (depending on the speed of the floor guy). Well, Buddy told Joe that night that he had everything worked out with the floor guy. Since Joe had already told him what the plan was, Joe assumed that working it out meant that he was going to follow the plan. That was a stupid assumption. Buddy isn’t over there today. What he meant when he said, “worked it out” with Maurice is that he just isn’t going to show up again until next week so that he could stay out of the way.

Joe told him that it was unacceptable. We have to get our stuff moved in! We will be gone Sunday through Thursday and we have to be out of Crackton by Friday! He needs to be finished! Since he said that he could be done with everything by Friday, that meant that he should have been able to be finished with at least the master bath by Thursday! Which meant that we could move in! Now who knows how long it’s going to be. If one more thing goes wrong with Buddy, I’m going to call him myself and cuss him out. I don’t think Joe is getting his point across well enough. Why does this have to be so difficult? Joe told him what to do and he changed it. It’s stupid.

But, on the positive, our cabinets arrived yesterday. They were in boxes in our garage. We opened up one to look at it. It was hard to see the cabinet, but it looked pretty! It looked a little more red than I had anticipated, but right now it’s hard to tell. They’re in the garage and it wasn’t very well lit and it was still in a box. So, we’ll be able to tell tonight! :) I think they’ll look really good.

I'm trying to stay positive about all of this. No matter what, Joe and I have to be moved in on next Friday (Halloween). If everything is not finished, I am going to have a conniption. I take that back, I will accept it if the half bathroom is not completely finished yet. However, if anything else is still unfinished, someone is going to pay for it. We set it up so that everything would be finished last week. My mom left a week ago. They still aren't finished with the things that were supposed to be finished when she got here 2 weeks ago. I can tell you one thing. People asked us to give recommendations for workers after we finish remodeling our house. Buddy and Paul will be getting no recommendations. I will be telling people to stay as far away as possible. This is f*@#ing ridiculous.